Operations / Lean

Queue Time (Lead-Time Decomposition)

The part of manufacturing lead time a job spends waiting in line, not being worked, almost always the largest slice, and the one nobody measures.

The fork, why two teams get different numbers

Manufacturing lead time decomposes into queue + setup + run + wait + move, and the forks are which buckets get merged and which count as "value." APICS distinguishes QUEUE (waiting BEFORE an operation) from WAIT (waiting AFTER, for the move), most dashboards collapse them, losing where the delay actually is.

In the Metric LibraryGet the Metric Library

Reference: APICS/ASCM manufacturing lead-time elements · Lean value-stream (VA/NVA) convention · Little's Law