Operations / Manufacturing

Unplanned Downtime

Time equipment was down when it was supposed to be running, and the stop was not scheduled, the loss that hurts most because you did not see it coming.

The fork, why two teams get different numbers

The whole metric turns on where you draw the planned/unplanned line.

In the Metric LibraryGet the Metric Library

Reference: TPM "six big losses" convention · SEMI E10 equipment-state standard · APICS/ASCM